
Porsche Guildford
Completed works at the Porsche Guildford showroom included partitions, ceilings, carpentry, decorating, and passive fire protection. Delivered to the highest standard, ensuring compliance and reflecting the premium quality of the Porsche brand.





Polestar Bristol
As main contractor, we delivered a full refurbishment of the Polestar showroom located within a busy shopping centre. Works included strip out, partitions and ceilings, carpentry, decorating, spraying, polished screed flooring, passive fire protection, and a renewed shopfront. The result was a modern, high-quality showroom completed to the highest standard.


Volvo/Kia Leicster
On this project, we carried out specialist works including partitions and ceilings, carpentry, decorating, and passive fire protection. Our team delivered a high-quality finish while ensuring compliance with all fire safety standards.



Kia Bicester
As the main contractor, we successfully delivered a full package of works including strip out, partitions and ceilings, carpentry, glazing, decorating, groundworks, soft flooring, tiling, and passive fire protection. From start to finish, we managed every stage with precision to ensure quality, safety, and a seamless finish.



Volvo Swindon
On this project, we delivered a full package of specialist works including partitions and ceilings, carpentry, decorating, glazing, furniture fit-out, signage, IPS units, and cubicles. Our team ensured a high-quality finish that reflected the premium standards of the Volvo brand.



Kia Reading
For this project, we took the lead as main contractor, transforming the showroom from the ground up. Our scope covered everything from the initial strip out through to partitions and ceilings, carpentry, glazing, decorating, soft flooring, furniture fit-out, wall panelling, groundworks, and full passive fire protection. The result was a modern, functional, and visually striking space de



Volvo Newbury
As main contractor, we delivered a full ground-up build for a new steel-framed dry valet facility. Our works included excavation, ground preparation, installation of a polished concrete floor, and the erection and completion of the steel frame structure. The result was a durable, high-quality building designed to support Volvo’s operational needs.

